Ashfield Aquatic Center Redevelopment

160-162 Elizabeth St. Ashfield NSW

Project description

Demolition of existing 50m pool, water polo pool, existing change facilities, eastern grandstand, indoor pool plant room, old club house and old plant room; • Rebuilding a new 50m pool with accessible ramp and split boom; • Rebuilding a new outdoor program pool with movable floor; • Building new children leisure pool; • New two story entry building to accommodate new entry, cafe, change areas, crèche, staff facilities, retail space and existing indoor pool; • New 1000m2 gym on level 2 of the new entry building; • New sauna, steam and spa; • New plant room to service the new pools and new building; • Alterations to the existing western grandstand to create community green space and covered seating; • New landscaping and green wall to the children leisure pool; • New landscaped areas and terraces to the external pools; • Amendments to the Frederick Street car park and extension of the Bastable Street car park to increase the parking space required for the new development; • All new services associated with the new pool, and upgrade services to the existing pool • Hall; and • Replacement of fencing between Pool Site and Bastable Street carpark, and Frederick Street carpark.

LGR Works

  • Supply and install KingZip Linea 400 over the gym roof building up to the pool hall junction including structural deck, halter & insulation.
  • Supply and install KingZip Linea 400 over the pool hall, spa, sauna & steam room.
  • Supply and install  aluminum box gutter to main roof including flashing and welding to ensure watertight seal.
  • Supply and install Palram skylights.
  • Supply and install all flashings, trims, sealing and caulking as required to ensure building is water tight. Provide all roof penetrations including under flashings.